Site Intelligence
EV Charger Site Ranking Tool
Score your parking lot's suitability for commercial EV charging. Five-factor model — traffic, parking, EV density, NEVI corridor proximity, and electrical capacity.
Site characteristics
Site score
Suitability score
63/100
Average
For an address-specific score with utility incentive overlay, run the full property assessment.
Frequently asked questions
What makes a site rank highly?
High AADT (annual average daily traffic), 30+ usable parking stalls, dense EV ownership in the surrounding ZIP codes, proximity to a NEVI-designated corridor, and existing electrical service of 200A+ at the property.
Is NEVI corridor proximity required?
Not required for profitability, but sites within 1 mile of a NEVI-designated corridor are eligible for federal NEVI funding that covers up to 80% of installation cost.
Can low electrical capacity be fixed?
Yes. Utility make-ready programs (PG&E, SCE, SDG&E) cover or subsidize panel and transformer upgrades for qualifying commercial EV charging projects.